Design Engineer Construction Programme

We are very grateful for all the work that Ingleton Wood do for our students through the Design Engineer Construct programme. This week they were winners in their category for this work to bring the world of architecture, engineering and construction into the classroom, and for all they do to support young people with their careers. It was a privilege to join them at the awards dinner.

Skip to content